top of page

Hot Pour Crack Filling

In the summer season (June-November), we perform  asphalt crack filling . Asphalt crack filling is performed with a Beram 190 Sealer. We use hot applied joint and crack filler which has low temperature bonding properties, providing prolonged resistance to degradation from weather and a positive seal during the expansion and contraction of the joint or crack. This filler prolongs the life of asphalt, reducing the need for expensive replacement. This treatment is recommended for concrete and asphalt. Cracks are routed or cleaned (or both) prior to sealing.

bottom of page